Before Kitchen
We did all new ceilings, to get rid of the popcorn ceiling, also we did a bunch of new sheet rock walls because they had wood paneling. We put in hard woods thru out and painted every room in the house and added crown molding. It was all done in 3 1/2 weeks. We still have a ton more work on the bathrooms and fixtures, knobs, etc. But that will have to wait until next summer.
After
During
Dining room during
Harrys room during
living room after crown molding
I have a few more after we moved in I need to upload
Dont mind all the clutter, so much stuff to unpack!
Jewel Ball got a little crazy
Swimmin with my bestie Caroline
Harry and Johnny are in gymnastics this summer and love it!
my blue eyed stud
San Fran
A delicious spot called Hops and Hominy
Full House was filmed right near here
a little early--breakfast spot
Frascati, best food ever!
Sausalito
Muir Woods
getting ready to ride the ferry
Fishermans Wharf